On 25 May, 2004, at the Bond Park Center, a meeting was held of the Cary Budget Committee. Attending where Don Hyatt and Mike Dodson. Since there were only two members present, the meeting evolved into a work session. The core focus was the Cary CIP budget for 2005. A good percentage of the CIP was reviewed, line by line. The following is some highlights of this review.
Fire
a. Why no money at all?
b. 2006 - 1.4 Million for Fire Training Facility: What is wrong with Jorden Lake Facility
General
a. Storm Drainage Project - 200K: What exactly is this?
b. Storm Drainage System Database - 300K (2.1 Million total) This is a lot money just for a database: need additional details
c. Vehicle Replacement (SUVs): No money for 2005; this is a big fleet and how efficent at maintain fleet (Another committee?)
d. TCAP - Town Center Streetscapte Improvements: Why are the different projects scattered around the budget? Is there any coordination in this plan?
e. Police Cruiser Replacement - No money this year, but 4.5 Million over next ten years. Do we need to actually replace the car, with new maintence shop being built, couldn't life expentancy of the vehicles be lenghten"?"; i.e., new motors & parts (or buy imported
Nissan & Toyota Diesel sedans/minivans (how many "high-speed" chases per year does the CPD actually do); do they really need big cars?)
f. Scooters - What Scooters?
g. Median Plantings - no money: small change, maybe 25K this year?
h. Alternative Fueling Feasibility Study/Station - no money, but 450K in 2006. Another consultant hits the jackpot. (Hire a history/comm student right out of College (strong research backgrounds), pay 26K per year to do various "research studies" for TOC.
i. Land Purchase for Maintenance Facilities - 400K: Consider purchasing land adjuctant to either or future waste water treatment facilities (land should be much cheaper)
j. Operations Center Parking Deck - 300K, but 2.7 million in 2006. NO - either park & ride C-tran or go to 2nd shift
k. Aerial Topograhic Mapping - no money, however 700K in FY2009. Old technology, can hire Russian "Spy" Satillites and "consulants" much cheaper, it is all digital now.
Parks
Ok, a day late and a dollar short, but....
a. North Cary Community Center-1 - 435K; move out to 2006 or 07, and maybe change location to reflect actually growth in North Cary.
b. Bartley Community Park-1 - 3.5 million; separate into several phases and move out over 2 or 3 period.
c. Bond Park Water Line - $138,000: Two options: 1) Drill a commerical well (50 gpm) and use well water for "fire protection" ($20,000); 2) High Speed pump/generator combo and pump water directly out of Bond Lake for "Fire protection" ($15,000 - Grainger Catolog)
d. TCAP-Town Hall Gateway Project (split Funding) - 119K from TOC. Objection to "fixed" artwork in TOC; a more static approach to art is desired (50/50)
Sewer
a. Dutchman's Branch Region Pump Station, Force Main & Intercepter - no money, howeve estimated 7.5 million in FY 2012; shouldn't this be move up to a "high" priority?
Transportation
a. Annual Sidewalk Improvement - 200K and 200k per year to FY 2015: suggest this be cut back for the next several years.
b. Bicycle Facilities Improvements - $40,000; suggest this be cut back to just $5000 for bike racks on C-Tran.
c. Traffic Calming - 100K, and 3.5 million over next ten years. We think these are "speed bumps." With this many speed bumps, won't this diminish Cary's "Quality of Life?"
d. Aviation PKway Widening (Morrisville ETJ to National Guard Dr) (with curbs and Sidewalks) - 4.9 million in FY 2009/2010. Why? There is nothing there.
e. TCAP - Downtown Roundabouts - 250K; coordinate with other TCAP projects
f. High House Road Widening - 1.6 million in FY 2006. Is this 1.6 additional money needed because they are adding a "median" to this project?
Discussion Questions:
1) What is the different between Open Space Acquisiton and Future Funded Greenway Projects?
2) Why are so many "big" parks being built in East Cary, and so close togather as well?
3) Why not have a centeralized Motor Pool system?
4) The Future PArks Program seems to be "overly" aggressive; why so aggressive and do we need all these mini-parks?
5) What are we actually paying in debt service now, and when we bring these future bonds into use? What are all this bonds going to cost us in the future?
6) How much does a 1 cent property tax increase buy us in "bond" money?
Submitted by:
Mike Dodson B-)
Fire
a. Why no money at all?
b. 2006 - 1.4 Million for Fire Training Facility: What is wrong with Jorden Lake Facility
General
a. Storm Drainage Project - 200K: What exactly is this?
b. Storm Drainage System Database - 300K (2.1 Million total) This is a lot money just for a database: need additional details
c. Vehicle Replacement (SUVs): No money for 2005; this is a big fleet and how efficent at maintain fleet (Another committee?)
d. TCAP - Town Center Streetscapte Improvements: Why are the different projects scattered around the budget? Is there any coordination in this plan?
e. Police Cruiser Replacement - No money this year, but 4.5 Million over next ten years. Do we need to actually replace the car, with new maintence shop being built, couldn't life expentancy of the vehicles be lenghten"?"; i.e., new motors & parts (or buy imported
Nissan & Toyota Diesel sedans/minivans (how many "high-speed" chases per year does the CPD actually do); do they really need big cars?)
f. Scooters - What Scooters?
g. Median Plantings - no money: small change, maybe 25K this year?
h. Alternative Fueling Feasibility Study/Station - no money, but 450K in 2006. Another consultant hits the jackpot. (Hire a history/comm student right out of College (strong research backgrounds), pay 26K per year to do various "research studies" for TOC.
i. Land Purchase for Maintenance Facilities - 400K: Consider purchasing land adjuctant to either or future waste water treatment facilities (land should be much cheaper)
j. Operations Center Parking Deck - 300K, but 2.7 million in 2006. NO - either park & ride C-tran or go to 2nd shift
k. Aerial Topograhic Mapping - no money, however 700K in FY2009. Old technology, can hire Russian "Spy" Satillites and "consulants" much cheaper, it is all digital now.
Parks
Ok, a day late and a dollar short, but....
a. North Cary Community Center-1 - 435K; move out to 2006 or 07, and maybe change location to reflect actually growth in North Cary.
b. Bartley Community Park-1 - 3.5 million; separate into several phases and move out over 2 or 3 period.
c. Bond Park Water Line - $138,000: Two options: 1) Drill a commerical well (50 gpm) and use well water for "fire protection" ($20,000); 2) High Speed pump/generator combo and pump water directly out of Bond Lake for "Fire protection" ($15,000 - Grainger Catolog)
d. TCAP-Town Hall Gateway Project (split Funding) - 119K from TOC. Objection to "fixed" artwork in TOC; a more static approach to art is desired (50/50)
Sewer
a. Dutchman's Branch Region Pump Station, Force Main & Intercepter - no money, howeve estimated 7.5 million in FY 2012; shouldn't this be move up to a "high" priority?
Transportation
a. Annual Sidewalk Improvement - 200K and 200k per year to FY 2015: suggest this be cut back for the next several years.
b. Bicycle Facilities Improvements - $40,000; suggest this be cut back to just $5000 for bike racks on C-Tran.
c. Traffic Calming - 100K, and 3.5 million over next ten years. We think these are "speed bumps." With this many speed bumps, won't this diminish Cary's "Quality of Life?"
d. Aviation PKway Widening (Morrisville ETJ to National Guard Dr) (with curbs and Sidewalks) - 4.9 million in FY 2009/2010. Why? There is nothing there.
e. TCAP - Downtown Roundabouts - 250K; coordinate with other TCAP projects
f. High House Road Widening - 1.6 million in FY 2006. Is this 1.6 additional money needed because they are adding a "median" to this project?
Discussion Questions:
1) What is the different between Open Space Acquisiton and Future Funded Greenway Projects?
2) Why are so many "big" parks being built in East Cary, and so close togather as well?
3) Why not have a centeralized Motor Pool system?
4) The Future PArks Program seems to be "overly" aggressive; why so aggressive and do we need all these mini-parks?
5) What are we actually paying in debt service now, and when we bring these future bonds into use? What are all this bonds going to cost us in the future?
6) How much does a 1 cent property tax increase buy us in "bond" money?
Submitted by:
Mike Dodson B-)